H
HRIDAY/
Enter Workbench
REFINERY CAD RECORD • SHEET PID-2026-CRK-001RASTER SCAN
Engineering Evidence Ingestion
Decades of unlinked paper blueprints, isolated SOP binders, and unindexed equipment specs.

In operating refineries, critical topology is trapped in 40-year-old drawings. Manual line tracing creates compounding operational friction during turnaround maintenance.

SCALE: 1:50 METRIC • ISO 10628PHYSICAL PLANT ➔ ENGINEERING EVIDENCE
SIH 2026 Sovereign Industrial AI Workbench • Team Garud

Industrial intelligence without exposing industrial knowledge.

HRIDAY transforms brownfield engineering documents into evidence-grounded, explainable maintenance intelligence while keeping topology decisions deterministic and human-controlled.

Scroll down to initiate pipeline reconstruction
EVIDENCE LOADED: CRUDE FEED SUBSYSTEM P-101 [DEMO FIXTURE]
Act II • From Pixels to Deterministic Geometry01 • Raster Blueprint

40-year-old scanned raster paper with noise, compression artifacts, and unindexed geometry.

+ [ISO GRID: A1-D4] • SHEET: PID-2026-CRK-001 (DEMO FIXTURE)
V-101CRUDE ACCUM.V-101 [0.98] VESSELHV-101HV-101 [0.95]P-101CRUDE PUMP [DEMO]P-101 [0.97] PUMP (DEMO)SUCTION FLANGEDISCHARGE NOZZLEMXV-201XV-201 [0.96] MOV (DEMO)DR-101 (Demo)✓ TEE JUNCTION DETECTEDPI1010.88 GATE • QUARANTINE ITEMTO HEATER E-1018"-CRK-090 (BYPASS)✓ NO DOT • ARBITRATED AS BYPASS
Visual Representation of Pipeline • Not Live Backend Output
01
Raw Scanned P&ID
02
Document Ingestion
03
Perception & OCR
04
Pipe Line Extraction
05
Port & Endpoint Snapping
06
Junction & Crossing Arbitration
07
Deterministic Topology
Act III • The Graph Emerges in 3DNetworkX Topology Extrusion

2D P&ID entities physically lift out of the blueprint into an authoritative 3D knowledge graph with provenance tethers.

CONNECTED EDGES0 / 4 COMMITTED
DEMO FIXTURE
P&ID COORDINATE PLANE (BASE)➔3D NETWORKX KNOWLEDGE GRAPH
Visual Representation • Not Live Backend Output
PROVENANCE-ANCHORED MULTIGRAPH:V-101 [Suction]➔P-101 [Feed Pump]➔XV-201 [Discharge MOV]+DR-101 [Drain]
Act IV • The Governed Agent01 • Ingestion

Constrained natural-language reasoning executing governed NetworkX graph routines with dual-evidence grounding.

CONTROLLED DEMO FIXTURE
ENGINEERING QUERY:
"Analyze pump P-101 and prepare an isolation summary."
GOVERNED NETWORKX TRAVERSAL (DEMO)RADIUS: 2 HOPS
V-101SUCTIONP-101FEED PUMPXV-201DISCH. MOVDR-101
SUCTION BOUNDARY:V-101 ➔ HV-101 (Manual Gate)
DISCHARGE BOUNDARY:P-101 ➔ XV-201 (Motorized MOV)
BLEED POINT:DR-101 (1/2" Casing Drain to Sump)
CLASSIFIED INTENT & SAFETY GATEREAD-ONLY QUERY
Intent: MAINTENANCE_ISOLATION_PLAN • Target: P-101
Statutory Safety Check: Actuation commands (trip/open/close) rejected.
# Governed NetworkX Topology Traversal Routine
subgraph = topology_graph.extract_neighborhood(target="P-101", radius=2)
boundaries = topology_graph.find_isolation_boundaries(
  source="P-101", valve_types=["MOV", "HV", "DRAIN"]
)
DUAL-EVIDENCE GROUNDINGIMMUTABLE PROVENANCE
P&ID COORDINATES
PID-2026-CRK-001
[X: 240mm, Y: 290mm]
SOP PROCEDURE
SOP-2026-HYD-001
Clauses 4.1 – 4.8
LOTO ISOLATION PACKAGE COMPILEDDEMO FIXTURE
Synthesis time varies by document complexity • 3 Physical Boundary Tags Ready for PTW Export
01
Query Received
02
Intent Classification
03
NetworkX Formulation
04
Topology Traversal
05
Evidence Grounding
06
Isolation Package
Act V • Human Verification GateConstitutional Invariant

Ambiguity is quarantined, never hallucinated. AI proposes. Evidence supports. Human decides.

DEMO FIXTURE • BELOW 0.90 GATE
CASE: VER-2026-088 [DEMO FIXTURE]
QUARANTINED
TARGET INSTRUMENT:PI-101 (Suction Pressure Gauge) [Demo Fixture]
CONFIDENCE RATING:0.88 (Below 0.90 Gate)
CAD COORDINATE:Sheet PID-2026-CRK-001 [215mm, 310mm]
DILEMMA: Faded impulse line crossing 6" suction header without an explicit junction dot. Excluded from active topology pending verification.
Quarantined. Connection excluded from active isolation topology.
Lead Operations Engineer Sign-off (Demo Simulation):
CAD SUB-MILLIMETER FORENSIC LENS (DEMO FIXTURE)
ISO COORD: [215, 310]
6" CRUDE SUCTION HEADER [DN-150]PI-101AMBIGUOUS JUNCTION (0.88 - DEMO FIXTURE)
AUDIT RECORD: SHA-256 PROVENANCE LOGGEDSTATUTORY AUDIT READY
AI PROPOSES→EVIDENCE SUPPORTS→HUMAN DECIDES
Statutory Sovereignty Guardrails

Sovereign On-Premise Architecture

Engineered for confidential PSU critical infrastructure (ONGC, IOCL, GAIL). Zero external telemetry, loopback-only application enforcement, and complete data confidentiality.

Local-First Loopback Enforcement

Bound strictly to host interfaces (`127.0.0.1`). Sovereignty monitor continuously audits external socket attempts and logs network containment.

Constitutional Safety Invariant

Strictly rejects plant actuation commands (`trip`, `shutdown`, `open valve`). Acts strictly as a read-only, auditable intelligence copilot.

Enterprise SAP PM & e-PTW Ready

Exports deterministic RFC-compliant JSON work packages directly into existing Permit-to-Work and Plant Maintenance systems.